SERVICES

RETROFIT

Service soft-story seismic retrofit
solution
SUAVE BUILDERS, INC. 7 Steps Process
INSPECTION TO ASSESS BUILDING CONDITION
ENGINEERING ANALYSIS AND CONSTRUCTION PLANS
SUBMIT AND OBTAIN BUILDING PERMITS
TENANT HABITABILITY PLAN
FINANCING IF NEEDED
BUILDING RETROFIT
COST RECOVERY
OUR SOFT STORY SEISMIC RETROFIT SERVICES INCLUDE…
0% FINANCING AND ZERO
UPFRONT ENGINEERING COSTS
Our 100% financed solution includes zero
up-front cost and 0% percent interest.
COMPREHENSIVE DOCUMENT
FILING MANAGEMENT
Your dedicated account manager will assure
that all document processing is completed
timely and effectively.
COST EFFECTIVE ENGINEERING
AND CONSTRUCTION
We engineer and construct your buildings
seismic retrofit with cost in mind. You’ll
never pay for something that you don’t
need. Guaranteed!
COMPLETE SEISMIC SOFT STORY
RETROFIT SERVICES
We offer an A-Z design/build solution,
including services ranging from inspection
to Cost Recovery Program admin assistance.
HIGH QUALITY CUSTOM FRAMES
AND GRADE BEAMS
We use the highest quality
moment-resisting frames and grade beams
to ensure your building is safe during a
seismic event.
FREE ON-SITE INSPECTION
AND ASSESSMENT
Contact us to schedule a professional
on-site assessment of your property,
including a detailed project proposal and
qualified financing plan.
How long do you have to comply
to a Soft Story Retrofit
2
years
Submit proof of
previous retrofit, or
plans to retrofit or
demolish
3.5
years
Obtain permit to start
construction or
demolition
7
years
COMPLETE
CONSTRUCTION
More than
82000
residential and commercial
buildings were damaged or
destroyed
Over
200
Steel-Frame
Buildings suffered
significant cracking
$25+ Billion
in damages

GET THE PROCESS STARTED!


AWARDS AND RECOGNITIONS



Soft Story Buildings
Most soft story properties, both residential and commercial were not specifically designed to withstand shear or lateral forces. In an event of an earthquake these buildings can fail to withstand the building or structure, leading to substantial property damage or what is worse the loss of lives. California is currently drafting ordinances that require retrofitting of all soft story buildings, to reduce the structural deficiencies by the most economical and feasible method.
VULNERABLE BUILDING CRITERIA
- Consist of 2 or more stories wood frame construction
- Build under building code standards enacted before January 1, 1978
- Contains ground floor parking or similar open floor space

SUAVE BUILDERS, INC.


6440 Lusk Blvd.
Suite D-209
San Diego, CA 92121
11801 Pierce St.
Suite 200
Riverside, CA 92503
2915 Red Hill Ave.
Suite F106
Costa Mesa, CA 92626
5352 Laurel Canyon Blvd.
Suite 200
Valley Village, CA 91607
367 Civic Drive,
Suite 14
Pleasant Hill, CA 94523